| FAST WALL | | HALF SLAB |
 | With FAST WALL panels, erecting wall is not dependent on skilled bricklayer and plasterer. No special skill is required in erecting the wall. Installation averages 16m2/man-day.
Download brochure | |  | PCF Half Slab panels are typically 50mm to 65mm in thickness and 2400mm in width. Prepared to the required span, the panel are laid between support and use as PCF for an in-situ concrete topping. Steel bars placed in the PCF Half Slab panels act as the reinforcement to resist flexural sagging.
Download brochure |
| MONOBLOCK SLEEPERS | | SEGMENTAL BOX GIRDERS |
 | The dedicated prestressed sleeper factory is located at Ipoh, capital of Perak state in Malaysia. The manufacture is based on a long-line production system which ensures a more controlled prestressing process and latest production equipment is employed.
Download brochure | |  | It is essential that the segments are match cast to one aother to produce the matching face either for glue or dry joint. This match-casting method of producing segments requires fresh concrete of the new segment to cast against the already hardened concrete of the old segment. A bonk breaker has to be applied to the hardened concrete surface to ensure that the segment would come apart.
Download brochure |
| SQUARE PILE | | TUNNEL SEGMENTS |
 | Piles are considered of displacement type and they shall be designed for both structural and geotechnical strength requirements. As geotechnical design involves pile - soil interaction the capacity then shall be usually assessed vide static pile load testing.
Download brochure | |  | The method of construction of a tunnel shall vary with the type and size of tunnel and kind of formation encountered; the construction generally shall be on the basis of either drill and blast construction or boring vide Tunnel Boring Machine - TBM (mechanical mole).
Download brochure |