HOMEEast Coast Expressway Phase 2MTD was awarded the contract to design and construct Package 10 of ECE2 in September 2006. The total length for Package 10 is 79 kilometers stretching from Bukit Besi Interchange at KM99.7 to Bukit Payung Interchange at KM163 with a distance of 63.3 KM, and branching off from the main line towards Federal Road 14 (Bukit Payung Spur Road) with a distance of 15.7 KM.
 Overview of alignment from Ch 131+000 to Ch 132+000 |  Overview of Bridge No.19 crossing over Mainline, Ajil Interchange at Ch 141+350 |
Construction of ECE 2 (Bukit Besi to Bukit Payung) has now reached a rate of completion of 62%. A full completion schedule by December 2010 is on track.
Taman Len Seng, KLThe Len Seng project was awarded to MTD by Dewan Bandaraya Kuala Lumpur (DBKL) in 2004 to upgrade, widen and rehabilitate KL roads (or known as Taman Len Seng Project) to ease congestion in the surrounding area.
The Len Seng upgrading project has been completed in November 2009. DBKL made its final inspection on 19th November 2009. DBKL expects the road to be open to public in early 2010.
ABROADDubai Metro ProjectACPM, a subsidiary of MTD-ACPI Engineering Berhad was awarded the supply of precast tunnel lining segment of approximately 6,500 rings for Dubai Metro Rail for:
- Phase 1 - Red Line stretching from Rashidiya to Jebel Ali Port (3.5km)
- Phase 2 - Green Line stretching from Airport Free Zone to Health Care City (5.9km)
 Precast Tunnel Lining Segment at Factory Site, Dubai |  Installed Precast Tunnel Lining Segment, Dubai Metro Project |
Commencement of project was April 2006 and was successfully completed in December 2008.
Delhi Metro ProjectThis project involves the supply, delivery and installation of precast segments for Delhi Metro Rail Corporation (DMRC) system under Package BC9. Package BC9 involves the design and construction of viaduct of 4.784km in length from Ch 9.707 to Ch 14.491 including structural works for 4 elevated stations at Nanglao, Nanglao Railway Station, Rajdhani Park and Munka on the Inderlock-Munka Corridor for Phase II to Delhi MRTS.
 Lifting of 5th segment of girder is in progress |  Overview from the ground, underneath Nangloi Station |
A total of 156 spans were erected using 3 launch girders to erect the segmental box girders and 3 gantries for parapet installation. We are in the final stage of completing this project and schedule for an overall completion by end of July 2009.
Jamarat Bridge, MinaThis project involves the improvement of Jamarat Bridge and the Surrounding Area in Mina, Saudi Arabia. We worked as one of the sub-contractors to Saudi Bin Ladin Group for this project.
Our scope of works comprises casting (80% of total casting works) and installation of precast segments including post tensioning works. The project was successfully completed in November 2009.
South Luzon Expressway, ManilaMTD Construction (Philippines) Inc. (MTDCPI) was awarded a turnkey contract by South Luzon Tollway Corporation (SLTC) to undertake the rehabilitation and upgrading of the South Luzon Expressway (SLEX).
SLEX is divided into three main packages; Toll Road 1 (TR1), Toll Road 2 (TR2) and Toll Road 3 (TR3). The total project cost is RM 678 million ( 8.5 billion Pesos).
TR1 involves a full rehabilitation and upgrading of the existing 1 km 6-lane Alabang Viaduct to 8 lanes.
TR2 involves a full rehabilitation and expansion of the existing toll road from Alabang, Muntinlupa City to Santa Rosa from four lanes to eight lanes and from Santa Rosa to Calamba from four lanes to six lanes for a total length of 27.4 KM.
Currently TR1 has been substantially completed and a final inspection was undertaken by the HE President of Philippines on 11th December 2008.
TR2 works are full of challenges and our team is persevering well with the working environment and challenges. Works is progressing well with its current progress of 90%.
TR3 works is progressing as scheduled and all the main sub-contracts works have been awarded. There was a delay in the implementation of TR3 due to late delivery of land by the authority.
The new completion date as per MTDCPI contract with its sub-con is January 2010.
The project includes rehabilitation of all toll plazas.
Above is a perspective of twin barriers being built to de-clog current Calamba Toll Plaza. The formely flood-prone roadway in the Alaska area in San Pedro was raised almost 2 meters with a new 3-barrel box culvert and soak-away ponds on either side. |  The TR3 segment in Greenfields. Almost daily rainfall and saturated ground limits roadwork. |  Rows of piers will support the flyover link to STAR Tollway in Sto. Tomas, Batangas. |